If you are planning work along Camano Island’s shore, start with your parcel before choosing a bulkhead design, ordering a dock or clearing vegetation. The rules depend on the shoreline’s classification and the work you propose.
Island County’s updated Shoreline Master Program took effect Nov. 2, following the state Department of Ecology’s Oct. 19 approval. The county says it also updated the shoreline mapping in ICGeoMap.
Find your property on the map
- Open ICGeoMap and search for your address or parcel number. If an address does not return a match, try the parcel number.
- Open Layers, select Shorelines and expand that group.
- Turn on Shoreline Environment Designations 2026. Use the legend to read the designation at your property and note its full name.
The classifications include Aquatic, Natural, Rural Conservancy, Urban Conservancy, Shoreline Residential and High Intensity. Shoreline Residential also has Historic Beach Community and Canal Community subcategories.
The map is a starting point. The adopted code says the designation map does not show the full extent of shoreline jurisdiction. That can depend on the ordinary high-water mark, associated wetlands and other site conditions. The county may need technical information to make a property-specific determination.
Check the work as well as the location
The county’s shoreline guide points readers to the use table in section 17.05A.080 and the development standards in 17.05A.090. The table identifies uses as permitted, conditional or prohibited by designation. A permitted category still has standards and review requirements to meet.
- Bulkheads: Describe whether you want to repair, replace or enlarge an existing structure. Those are different questions under the code. Ask which shoreline-stabilization studies and approvals apply to your proposal.
- Docks: Identify whether the work involves a new dock, a replacement, an expansion or repairs. Ask the planner to check both the use classification and the dock and pier standards.
- Vegetation: Explain what you want to remove and where. Native vegetation within shoreline buffers is generally required to remain in a natural, well-vegetated condition, with modifications allowed only as specified in the program.
A project can qualify for an exemption from a substantial development permit and still need county review. The review paths in section 17.05A.130.D include a shoreline exemption and a limited-review shoreline exemption. Ask a planner which requirements apply to your proposal. An exemption does not set aside the program’s other applicable standards.
Get help before committing to the work
Send your parcel number or address and a brief description of the proposal to PlanningDept@islandcountywa.gov. Ask the county to confirm the designation, shoreline jurisdiction, applicable standards, permit path and any reports needed.
The Planning Department’s current notice lists Camano planner duty days on the second and fourth Wednesdays of the month. Contact the department before visiting; questions can also go to the duty planner at 360-678-8340.
For erosion, drainage, bulkhead alternatives or planting ideas, the county’s Shore Friendly Program offers free, non-regulatory site visits. Call 360-678-2349 or use its online request form. That advice can help you explore options; permit review remains a separate step.