Subscribe

Camano shoreline rules: how to check your parcel before starting work

Updated shoreline maps can help you start planning. Here is how to find your designation, check the type of work and get county guidance before you begin.

A wooden shoreline structure and beach at Camano Island State Park.
Illustrative photo. © Cody Logan / Wikimedia Commons, “Camano Island beach 01” (CC BY-SA 3.0).

If you are planning work along Camano Island’s shore, start with your parcel before choosing a bulkhead design, ordering a dock or clearing vegetation. The rules depend on the shoreline’s classification and the work you propose.

Island County’s updated Shoreline Master Program took effect Nov. 2, following the state Department of Ecology’s Oct. 19 approval. The county says it also updated the shoreline mapping in ICGeoMap.

Find your property on the map

  1. Open ICGeoMap and search for your address or parcel number. If an address does not return a match, try the parcel number.
  2. Open Layers, select Shorelines and expand that group.
  3. Turn on Shoreline Environment Designations 2026. Use the legend to read the designation at your property and note its full name.

The classifications include Aquatic, Natural, Rural Conservancy, Urban Conservancy, Shoreline Residential and High Intensity. Shoreline Residential also has Historic Beach Community and Canal Community subcategories.

The map is a starting point. The adopted code says the designation map does not show the full extent of shoreline jurisdiction. That can depend on the ordinary high-water mark, associated wetlands and other site conditions. The county may need technical information to make a property-specific determination.

Check the work as well as the location

The county’s shoreline guide points readers to the use table in section 17.05A.080 and the development standards in 17.05A.090. The table identifies uses as permitted, conditional or prohibited by designation. A permitted category still has standards and review requirements to meet.

A project can qualify for an exemption from a substantial development permit and still need county review. The review paths in section 17.05A.130.D include a shoreline exemption and a limited-review shoreline exemption. Ask a planner which requirements apply to your proposal. An exemption does not set aside the program’s other applicable standards.

Get help before committing to the work

Send your parcel number or address and a brief description of the proposal to PlanningDept@islandcountywa.gov. Ask the county to confirm the designation, shoreline jurisdiction, applicable standards, permit path and any reports needed.

The Planning Department’s current notice lists Camano planner duty days on the second and fourth Wednesdays of the month. Contact the department before visiting; questions can also go to the duty planner at 360-678-8340.

For erosion, drainage, bulkhead alternatives or planting ideas, the county’s Shore Friendly Program offers free, non-regulatory site visits. Call 360-678-2349 or use its online request form. That advice can help you explore options; permit review remains a separate step.

Justabouts

Justabouts

Local news, events, and useful updates for Marysville, Arlington, Stanwood, and surrounding communities.

All articles

More in Help & Resources

See all

More from Justabouts

See all